Tasmania's maximum size for a granny flat, officially a secondary residence, increases from 60m² to 90m² on 25 November 2026. It's a planning scheme change, not a change to the National Construction Code, so building approval requirements stay the same.
Tasmania's maximum size for a granny flat, officially a secondary residence, increases from 60m² to 90m² on 25 November 2026. It's a planning scheme change, not a change to the National Construction Code, so building approval requirements stay the same.
The State Planning Provisions (SPPs) are the statewide rules that sit inside every Tasmanian planning scheme. Amendment 01/2026 raises the allowable gross floor area for a secondary residence from 60m² to 90m² and clarifies how the secondary residence definition operates.
According to the State Planning Office, the amendment was gazetted on 11 November 2026 and takes effect on 25 November 2026. The 90m² allowance applies to a secondary residence on the same property as a main house, where that house is a single dwelling on a single lot under the planning scheme.
No. Several news stories have described it that way, but the amendment changes the Tasmanian Planning Scheme, which controls land use and development standards. The National Construction Code, which governs how a building is constructed, is separate and unchanged by this amendment.
In practice, a bigger granny flat can be allowed by the planning scheme and still needs:
The Premier said the old 60m² limit suited a single person or a couple. At 90m² a secondary residence can realistically include two bedrooms, a separate living area and more generous circulation. That opens the option to adult children, grandparents or ageing parents, or a long-term tenant.
The size limit is one of several rules. Before you plan a 90m² flat, check:
A compliant granny flat may not need a planning permit, but that depends on the zone, overlays and the full proposal. Our guide on whether you need a planning permit in Tasmania explains how to check, and building work categories covers the building side.
We can check your zoning and overlays, test what fits within 90m², and prepare the planning and building permit documentation. See our granny flat design service, run a property zoning and overlay check, or read how the Tasmanian approval process works.
This article is general information, not legal or planning advice. Confirm the rules for your site with your council or a building designer before you commit to a design.
Last reviewed: 24 November 2026.