Tasmanian building approvals depend on the work category. The same type of project can fall into different categories depending on its design and site.
Tasmanian building approvals depend on the work category. The same type of project can fall into different categories depending on its design and site.
The CBOS categories of building work guide describes the risk-based framework under the Building Act 2016.
Start with how the building will be used, its dimensions, whether it is prefabricated, where it sits on the lot, and what other structures are nearby. A shed for storage and a structure intended for living space can be assessed differently. Use the Director’s Determination on Categories of Building and Demolition Work and the CBOS shed and similar structures fact sheet with the actual plans. Ask your council or building surveyor to confirm the category.
An extension can change the structure, drainage, setbacks and how the building is used. Share existing drawings and the proposed changes with the building surveyor. Confirm planning and plumbing requirements separately, even if the building work has an identified category.
For the documents to prepare, read the Tasmanian building approval guide or see our extension and renovation design service.
Last reviewed: 19 November 2026.